My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1989 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1989 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:12:34 PM
Creation date
2/8/2019 9:46:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMENT PL1N PAGE 2 <br /> SPILL CONTROL PROCEDURES SECTION (11) <br /> SPILL CONTROL LEADER (12) LIRA PATEL <br /> (Also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br /> GIRA PATEL <br /> AUTHORIZED SPILL CONTROL STRATEGIES (14) <br /> This business has authorized the above personnel to perform the action(s) indicated below to control spills of <br /> hazardous materials on its property. Persons performing these tasks will possess written procedures for performing <br /> them and will have received training on the procedures and equipment needed. Locations of needed equipment are <br /> shown on the facility map. A business must at a minimum isolate the area of the spill and make notifications. <br /> Spills of Liquid Materials <br /> ®Plug and Patch Container <br /> ®Neutralize Spilled Material <br /> [:]Build Retention Dike <br /> ® Secure System Valves and Closures <br /> ®Remove Sources of Ignition <br /> ®Shutdown System Involved <br /> ®Position Container so as to Stop Leak <br /> ®Apply Absorbent Material to Spill Area <br /> ®Reduce Pressure in Container/System ❑Other... <br /> ®Isolate Area and Make Notifications <br /> Release of Compressed Gases Spills of Solid or Powder Materials <br /> ®Shut Off Valves/Systems ®Cover Spill to Prevent Spread <br /> ❑Ventilate Area of Release ❑Neutralize Spilled Materials <br /> ❑Reduce Pressure in Container/System ❑Position Container so as to Stop Leak <br /> ❑Suppress Vapors with Water ® Place Spilled Material into Drum or Bag <br /> ❑Isolate Area and Make Notifications ❑ Isolate Area and Make Notifications <br /> ®Remove Sources of Ignition ❑Other... <br /> ❑Other... <br /> AUTHORIZED CLEANUP COMPANIES SECTION (15) <br /> These cleanup companies will be accessed in the event that our business must expend funds to clean up a <br /> hazardous materials spill. <br /> ARCO MISSION CONTROL 1-800-272-6349 <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT# <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT# <br />
The URL can be used to link to this page
Your browser does not support the video tag.