Laserfiche WebLink
F �.. <br /> SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT TESTING <br /> Test Method Developed By: 0 UDC,Manufacturer a Industry Standard 0 Professional Engineer 3 <br /> 0 Other(Specify) 1. <br /> Test Method Used: ❑Pressure D Vacuum V Hydrostatic <br /> ❑Other(4,acify) <br /> TestEgWpmemUsed: LATS M46. Paoge ra --P!>k fi-tr=Teyt- EquiptnentResolution: NF1 jvrTr <br /> --— UDC# UDC# 3-41 UDC# S-- 6 UDC#— 7- <br /> UDC <br /> 7-UDC Manufacturer. <br /> UDC Material: A55 13 rYt d f�l S 5 <br /> UDCthe O" ,� %' O `►� 30 <br /> Height from UDC Bottom to Topr,r <br /> of Highest Piping Penetration: Cl r� ` <br /> Height from UDC Bottom to 11 r r i r, X <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to / /' <br /> 00� L4 00 " °ar, G ooh <br /> Portion of UDC Tested a <br /> Does turbine shut down when ®Yes ❑No ❑NA \ <br /> UDC sensor detects either d Yes ❑No ❑NA KYes 0 No 0 NA WYes 0 No ❑NA <br /> product or waterf ' <br /> Turbine shutdown response time <br /> Is system programmed for fart- 9 Yes 0 No 0 N ; � 0Na, ❑NA - 11 Yes ❑No ❑NA ■Yes 0 No ❑NA <br /> safe shutdown?' <br /> Was fail-safe verified to be 0 Yes ■No 0 NA ` ` <br /> F Y,! A64o ❑NA' ❑Yes ®No ❑NA ❑Yes B No ❑NA <br /> Wait time between applying , v <br /> starting tnlwater and V�?i.lJ�` -J s! MIA.) <br /> Test Start Time: a., & !-7:dj� <br /> Initial Reading ' ' •• r 000 uco a <br /> Test End Time: 5 �, f/r`bS / :D ' <br /> Final Reading O• °O�-`r \ `�rJ" '� 6,00c 11 <br /> Test Duration: / 1,t)� M 111 r+r 0 1.0 <br /> Change inR _ �. 0,obU,r a.VOC1 6,voc 11 0JOG// <br /> Pass/Fail Threshold ±'a,o o- a.002 " t- L5,002- <br /> Was <br /> .00 Was sensor removed for testing? Yes 0 No ❑NA; ®Yes ❑No 0 NA R Yes ❑No ❑NA it Yes ❑No ❑NA <br /> Was sensor properly replaced and -,R Yes/❑No ❑NA M Yes ❑No DNA D Yes ❑No DNA N Yes ❑No 0 NA <br /> verified functional after testing? '\,/ <br /> Comments—(inelude Wo on repairs made prior to testing,and recao,rnnended follow-up forfaikd tests) <br /> If the testing method does not test the entire depth of the UDC,specify how much of the UDC was tested. Methods not testing the <br /> entire UDC should only be used if the monitoring system provides fail-safe turbine shutdown. (Sce SWRCB LG 160) <br /> 3 With the submersible pump running,place the sensor in product(discriminating-senam should also be placed in water). The time <br /> between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br /> containment testing method used does not best the entire volume of the UDC <br /> This information is not needed if the entire UDC is tested. <br />