Laserfiche WebLink
From DIALYSIS NORTH t 19494501177 at IC 8/2002 2 : 16 PM 00( <br /> SWRC H,January 2002 Page S of <br /> 6. PIPING SUMP-11EYfING <br /> Test Nlcthod Developed By: Sump ManufacturT Industry Standard a Professional Engineer <br /> other(Specify) <br /> Tca+Metkm I leed- tatic <br /> Other (Specify) <br /> Test Equiprncnt Usr 1T0+1t Equ,Prnrnt Resolution- . Z1fj if <br /> _ -_- Sump�M l- - _ 5nrop# �- amp# SampOKA= # <br /> Sump Diameter 4;z " 'r. �!Z '' 2" <br /> Sump Depth,- <br /> Sump <br /> epth:sump Material: ► E? f.t SS 1 3 - (.4� �!� 7 L4.5 f>' — <br /> Hoight from Tank Top to TnP of I, i, -32, 01 3 �� <br /> Highest Piping Pcmatrabon! <br /> Height from Tank Top to Lowesi 3 b a S 1, 3 r, <br /> Electrical Penetration: - <br /> Condition of sump prior to testing' <br /> Portion of Sump Tested 3V A <br /> Does turbine shut down when a Yes _ No NA <br /> sump sensor detects tither product #Yes No -NA u Yes . :No -NA jp Yes .No .NA <br /> or water?* <br /> Turbine shutdown response titne2' + 3 s GG 1 ;4 see- <br /> is system programmed for fail-safe ► Yes 4 No ❑NA '..Yes tl No !INA C Yes w No L:NA Yes '!No 'NA <br /> shutdown? <br /> Was fail-safe verified to be - Yes A No NA :,Yus ■No ! :NA .Yes 411I No NA [Yss *No INA <br /> opcirationar, <br /> Wait time between applying <br /> pressti[refvacUwrJwater and starting fJo miji <br /> tCSt: <br /> Test Start Time: p :. 1 1[� "? ' S t lo <br /> Initial Reading(R, •Pori tune, �atso " p , o00 <br /> k 6 r <br /> Test End Time: [)` 2_2 d ` Z Z <br /> Final Rcadin$(RF): D • pv j` a r ca ` r� Pad [r •uo�.rr <br /> Test Duration.: Z w-t! Z PK i <br /> Change in Reading(RvRr): o DJ" <br /> pan/Fail Threshold or Criteria: + , J v�." �' u u�." O 0:1-' <br /> Tett Result: 2 Pass Cr Fag 7 Pan F.,Fall IN Piss ❑Fan .0 Pan !,l Fall <br /> Was wtzt ior removed for testin fr R Yes ❑No C NA Ryes :1 No I..+NA A Yes MNIo -NA ■Yes _'•No :INA <br /> Was sensor propmly replaced and !'Yes i I No . .NA ■Yes ❑No G NA W Yes .;No .INA 1t Yels I 1 No ❑NA <br /> verified fowtimal MIks testi <br /> comments— include m ornrah'),',rt iter Horde rior to resling, arnd recion[naerded ntlow-u ailed tests <br /> 'If rhe testing method does neat test the entire depth of the sump,specify how much orthe sump was tested, Methods not testing the <br /> entire sump should only be used if the monitoring system provides fail-safe turbine tmblown. (See SWRCB LG-160) <br /> 2 With the submersible pump running.Place the sensor in product(discriminating sensors should also be placed in water). The tion <br /> between placing the senmur in product and the turbine shutting down is the reponse tine_ This should be done if the s000ndary <br /> corrtairmeut testing method used does not test the entire volume of the sump- <br /> This information is not needed if the entire stoup is tested. <br />