Laserfiche WebLink
From DIALYSIS NORTH 4--. 19494501177 at 1`' "1$/2002 2 : 16 PM <br /> 00; <br /> SWRCB,January 2002 Page CD,Of <br /> 7_ UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By- UDC Manufacturer I. Industry Standard ■Professional Engincer <br /> Otitc_(Specify) <br /> Scat Method Used: I Pressure Vacuum it Hydrostatic <br /> I Other(*erify) <br /> Test Equipment Used: 14A p_aL,)J--CTk, f4eTUA, <br /> I EquipuL ul Resolution: s r r <br /> UDC# i UDC# 3 UDC it UDC u <br /> UDC Manufacturer: <br /> UDC Material: F,13 SS ,1 6C f <br /> UDC b`` <br /> I lcight from UDC F3oRrom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 5- r '700 <br /> Lowcst Electrical Penetration: <br /> Condition of UDC prior to / <br /> testis : 0 J 0 �0 � a L3 t7t7' <br /> Portion of UDC Tcstcd 17 +o I?" '` 1 z " <br /> Does turbine%hut down when <br /> UDC sensor detects either ■Yes No NA *Yes .'No i NA •Yes No .!NA *Yes No :NA <br /> uct or walW? <br /> Turbine ahutdownre n-&lane Eo Se- 13 JSSr.� <br /> Is system programmed for fail- . !Yes *No :INA Yea SNo INA NA Yes !No i NA Yes ■No J NA <br /> safe shutdown? <br /> Was fail-safe Vert Pied to be Yes rA No NA _Ycs VNo CNA -Ycs 0 N NA Yea NNo NA <br /> operational'? <br /> Wait time between applying <br /> pressure/v=uum/water and / <br /> gmynng test tvti t►.3 ti iS [ V l ►J <br /> Test Start Tin-to: S ' 2=v J ;OU <br /> Initial Reath (RE): p'00,0 d., �j.cap +� .nom.• (� , ��o •• <br /> 'fest End Time: S: 3 Z / ': <br /> Final Readng(111r): 0 , oI <br /> Tcst Duration: /2- <br /> :hsaitgC to Peadiiip •/ pQ 4 ♦ o v P r v U 00• <br /> PaWFeil Tht:cshold of Criteria •. oo "' • v 0.7- • 00'Z-" ate•" <br /> Tent R.eault ■ Pass ❑Fat] i a Fara O Fail ly PRU I I FW IN Pass 111 Fail <br /> Was sensor r+etttoved for[eating? A Yea i`No !1 NA to Yen i i No I:NA ill Yc t;No .1NA M Yes :t No ! :NA <br /> Was ProP�y replaced rend I!Yes L.No J NA N Yes !'!No I'•NA ■Yea "No LINA 2 Yes _No L NA <br /> verified functional after testing? <br /> Comments—ri+uehrde uVormadon on repairs made prior to testing amd rtitouo mendfed flow-up fpr fatted tests) <br /> T'aIT, t:�7 tjyi rua.�r+.*-V_,rpz S64aw9-5 LAP 4;.o0 ks� <br /> M,5 j-P t �&+40!t �->M CA ca-r 1 J X6 wl�i u, 1��5�a. f��r i t_ i <br /> S 's-n. % M,bfytu � w (30WA Ka F16" <br /> If the testing method does not teat the entire depth of the UDC,specify how much of the UDC was tested. Methods not testing the <br /> entire UDC aluould only be used if the monitoring system puovedes fail-afe turbine shutdown. (Scc SWRCB LCr-160) <br /> a With 16c submersible puntp running,Place the srnaor in product(discriminating sermots should also be placed in water). The time <br /> between planing the sensor in product and tit turbine shutting down is the response time. This should be done if)ht secondary <br /> ctratauin mt tcxbng method used docs not teat the cattum volume of Hue UDC <br /> This information is not needed if the entire UDC is tested. <br />