My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1011
>
2900 - Site Mitigation Program
>
PR0539578
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 5:15:45 PM
Creation date
2/8/2019 4:25:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0539578
PE
2960
FACILITY_ID
FA0022650
FACILITY_NAME
SPINGOLO TRUCKING
STREET_NUMBER
1011
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14324013
CURRENT_STATUS
01
SITE_LOCATION
1011 N BROADWAY AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;Fir»•rrec"i,.:,.;1.�'..��'�"'�!iii�Yr_= ..,..R.t.>:.'• <iiFi�$..ai..Tc=�:_z<-. s'.:a'..��3;;:1'.L'..�,.....�:w..�r""s':..::.�".c:-'-..el' G:£,e..:.._.:i=. '"r.,_.<..:.c�t.�c:�:rr�.:.rc=-=.c.�:... .r.rr..r:+.,�a <br /> Spingolo Trucking <br /> Page 2. <br /> and the soil around the cut off casing removed to a depth of an additional six inches <br /> below the new `top' of the cutoff casing. The grout sealant shall spill out of the top of the <br /> well casing to form a mushroom cap seal, with at least 12 inches of neat cement grout <br /> poured 6 inches above and 6 inches below the top of the cut off casing. <br /> The last monitoring event for MW-1 and MW-2 reported results of non-detect for <br /> petroleum hydrocarbons. These wells may be destroyed by pressure grouting from the <br /> bottom upward, while leaving the well casing in place. <br /> • All groundwater displaced to the surface during grout installation shall be pumped out of <br /> the excavation to allow for EHD inspection and verification that the well was properly <br /> destroyed. Contaminated groundwater pumped out of the excavation shall be <br /> containerized for proper disposal. <br /> The Well Contractor shall submit the completed EHD Well and Boring" Permit Application, along <br /> with the correct permit fees of $125 for each well and the $375 Inspection Activity fee to the <br /> EHD. A review of the site records indicates that currently three monitoring wells were installed. <br /> A fee of $750 (3 MW x $125 +$375) will.be required for the well destruction permit. The EHD <br /> will issue the well destruction permit only if the destruction methods noted on the permit meet <br /> with the requirements specified within this letter. <br /> Please be aware that you may be billed at a rate of $125 per hour for any further enforcement <br /> activity required by the EHD to obtain the documents or actions the EHD has requested within <br /> this letter. <br /> If you have any questions, please contact Adrienne Ellsaesser at (209)468-0343 or by email at <br /> aellsaesser(aD-sicehd.com <br /> Adrienne Ellsaesser, REHS <br /> Program Coordinator <br /> ec: Mr. James L. L. Barton, PG, California Regional Water Quality Control Board Central <br /> Valley Region, 11020 Sun Center Drive, Suite 200, Rancho Cordova, CA 95670 <br />
The URL can be used to link to this page
Your browser does not support the video tag.