My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1011
>
2900 - Site Mitigation Program
>
PR0539578
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 5:15:45 PM
Creation date
2/8/2019 4:25:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0539578
PE
2960
FACILITY_ID
FA0022650
FACILITY_NAME
SPINGOLO TRUCKING
STREET_NUMBER
1011
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14324013
CURRENT_STATUS
01
SITE_LOCATION
1011 N BROADWAY AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spingolo Trucking Page 2 <br /> 1011 N. Broadway Ave. June 25, 2008 <br /> Stockton, CA <br /> 3. The ground water flow direction according to quarterly monitoring reports prepared <br /> by AGE has been predominantly to the southwest at this site. and there is no <br /> groundwater monitoring well to the southwest of the former UST locations to <br /> investigate if there is impact to the ground water down-gradient of the former UST <br /> area. <br /> Therefore, a work plan should be submitted to EHD by July 30, 2008, for additional soil and <br /> ground water investigation (including installation of a monitoring well southwest of the former <br /> UST area) as well as a soil vapor emissions investigation. After the work plan is approved, the <br /> required EHD well permit application(s) and fees must be submitted to the EHD. After the EHD <br /> issues the well permit(s), the work should be completed within 30 days. A report on the work <br /> should be submitted to the EHD within 60 days of the completion of the work. <br /> Once the site data shows the extent of the contamination in the soil and ground water and it can <br /> be demonstrated that the residual contamination does not pose a risk to human health and the <br /> environment, the findings can be included in a No Further Action Required report request <br /> following the CVRWQCB Tri-Regional Board Staff Recommendations Appendix A. <br /> If you have any questions, please contact Harlin Knoll at (209) 468-3442. <br /> Harlin Kno"RFEHS, Marg�Lagorio, RE S <br /> Senior Registered Environmental Health Specialist Program Coordinator <br /> CC: James Barton, CVRWQCB <br /> Bill Little, Advanced GeoEnvironmental, 837 Shaw Road, Stockton, CA 95215 <br />
The URL can be used to link to this page
Your browser does not support the video tag.