Laserfiche WebLink
CLOSURE PLAN CalRecycle 504(Rev.6/14) <br /> Page 3 of 4 <br /> "Destination Charge"represents the total cost of tipping fees or disposal fees for all loads of waste tires transferred from the cleanup <br /> site to the destination facility. The Destination Charge shall be computed using the following formula: <br /> Destination Charge($)=MT x TF <br /> Factor"MT"is described above. <br /> Factor"TF" ($per load)represents the cost to deposit waste tires at the destination facility. This may be a tipping fee or a <br /> disposal fee. If the fee is expressed in dollars per ton then this number must be multiplied by the weight of the load in order to <br /> yield dollars per load. The tipping fee should be based on the form of the waste tires(e.g.,shreds vs.whole). <br /> Closure Cost Estimate Worksheet Con't <br /> "Loading Cost"represents the total cost of loading all loads of tires into vehicles at the closure facility and unloading the vehicles at <br /> the final destination. The Loading Cost shall be computed using the following formula: <br /> Loading Cost($)=MT x LC <br /> Factor"MT" is described above. <br /> Factor"LC"($per load)represents the unit cost to load one vehicle with waste tires at the closing facility,and to unload the same <br /> waste tires at the final destination. This cost includes operational expenses,which covers wages for workers and pro rated <br /> expenses for rental or lease of equipment and machinery. <br /> "Administration Cost"($)represents the total cost of administration activities for the entire closure operation. This cost shall include <br /> the wages for personnel overseeing the cleanup activities and other operating expenses for the entire project. <br /> "Security Cost"($)represents the total cost of security arrangements for the entire closure operation. This is the cost to secure the site <br /> and restrict public access. This cost covers the expenses for the entire cleanup operation and includes installation of a site fence, <br /> installation or repair of lighting,and wages for security guards,etc. <br /> Notes: <br /> 1. Total Closure Cost Estimate will vary according to the facility's design and operation as presented in the Operation Plan, <br /> Form CalRecycle 501 (6/14). <br /> 2. All costs will be added and then multiplied by the contingency factor of 1.2 to estimate the Total Closure Cost for the <br /> cleanup. <br /> 3. Any deviations from the above formula must be explained. <br /> 4. Complete a separate closure cost estimate worksheet if the waste tires are to be transported to more than one point of <br /> destination <br /> OPERATOR CERTIFICATION: <br /> 1 certify that this document and all attachments were prepared under my direction or supen?ision. I have inquired of the person or <br /> persons who manage the system or those persons directly responsible for gathering the information, and certify that the information <br /> submitted is, to the best of my knowledge and belief,true,accurate and complete. <br /> Facility Operator or Agent ftnatm: <br />