Laserfiche WebLink
' S <br /> Valley Water Treatment � <br /> Corrective Action Plan PF Page 6 <br /> i CPE Project No.480.3 <br /> December 12,2006 <br /> Below the maximum depth of fill material, the soil boring will sampled at 5- <br /> foot intervals for geological and possible analytical evaluation. The sampling <br /> and analytical methods to be used as well as the"completion details will be <br /> the same as those used for construction of the original MW-1, as described in <br /> the original Work Plan. <br /> F <br /> 5.6 Groundwater Sampling <br /> Upon completion, the replacement well.will be developed and sampled in the <br /> same manner as the original well was. <br /> 6.0 REPORTING <br /> i The information gathered during this phase of work will be presented in a <br /> report, which will include the results of field data, and sample analyses <br /> collected, and their implications. The report will be prepared and signed by <br /> the registered professional geologist responsible for''the work. <br /> I <br /> 2937 Veneman Ave.,#5240 Geo-Phase Environmental Inc. _ Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />