Laserfiche WebLink
(d) Initial installation &aoting*. <br />The Convault waste oil tank was pressured tested to 5.0 psig for 24 hours by the <br />manufacturer prior to shipping. <br />The PVC construction of the used coolant tank precludes pressure testing. <br />(f) Not Applicable: Exterior tank materials of construction, concrete and PVC are not <br />measure - <br />Responsibility ofthe facility operator <br />(h) This section applies to this installation per Title 22 CCR 66265.192 (h)(2)(A). <br />(i)Not Applicable: Tank isabove ground. <br />(1)Secondary Containment: <br />The waste oil containment tank has double wall construction. The secondary <br />containment capacity is 1,500 gallons and is capable of containing 150% of the <br />contents ofthe tank and ancillary piping. <br />The used coolant tank has double wall construction. The secondary <br />containment capacity is 275 gallons and is capable of containing 138% of the <br />contents ofthe tank and ancillary piping. <br />(2)Not Applicable: Secondary containment iasealed from ambient precipitation <br />(3) Leak Detection" Documented daily inspection. <br />(WTank Assessment: <br />(1) Tank Configuration <br />Mehaha| of Construction'. <br />Primary Inner Tank�A-38Carbon steel <br />Secondary Containment: High Density Polyethylene <br />Outer Shell: Reinforced Concrete <br />