Laserfiche WebLink
CLEARWATER s <br /> G R O U P, 1 N C. <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION...:. ...........:.. 2 <br /> 1.1 Site Description'. :s. 2 <br /> _ 1.2'- Previous Work ... .. ............... <br /> 2.0 PROPOSED WORK.•.............: 4 <br /> 2.1' Sampling. and Removal of.Soil Stockpiles...... ............ `......... 5 <br /> 2.2 Excavation Shorin Backfillin and <br /> g, g,. Compaction..........................5 <br /> 2.3 Installation of Monitoring Wells and Vapor Extraction Wells.............6 <br /> 2.4 Soil. Vapor Extraction Pilot Testing....:.........:......:.....:..........:..5 = <br /> 2.5 Groundwater Extraction Tests...........:.......".......:.. g <br /> 3.0 PROJECT REPORTS.." <br /> .............. ' <br /> ..... ....;... .... V ..........1,1 <br /> 4.0 CERTIFICATION: ..........: 12 <br /> ' FIGURES <br /> Figure 1: Site Location Map <br /> Figure 2: Site Plan <br /> Figure 3:, Proposed Monitoring Well Design <br /> Figure 4: Soil Vapor Extraction Well Design <br /> APPENDICES <br /> Appendix A: Clearwater Field Procedure_s <br /> Appendix B: Soil Vapor Extraction Test Protocols <br /> -Appendik C:; Constant Discharge Aquifer Test-Field Procedures and Proi0cols. <br />' Appendix D: Site Safety Plan <br />