Laserfiche WebLink
. . . ��$ate,` <br /> CTE'LEARWAR - <br /> G• R 'O U-P, 1 N C. " <br /> PVC casing and 20 feet of screen with p.020-inch-wide slots .(Figure 3). A sand' <br /> filter pack will be constructed using No. 3 sand. <br /> The annular space in all wellswill be filled with filter pack sand,to a depth , <br /> that is,approximately one to three feet above the top of the slotted screen. At <br /> ' the 'top of the filterack <br /> p the wells will be sealed usinga layer of hydrated ' - . ' . <br /> bentonite at least two feet thick. The' remainder of the' annulus will be filled <br /> with neat'cement'or acement/bentonite-mixture (Appendix.A): <br /> Soil Va r Extracti n We1I <br /> Four soil borings will be drilled and converted to SVE wells in the area of the <br /> large backfilled excavation after asphalt paving has been placed at the surface. <br /> Figure 2 presents the proposed SVE well locations. -(Note .that these locations <br /> may ,be .modified - if shoring has been installed in the excavation' and l <br /> ;. additional soil has been removed.) <br /> ' . The, wells will be constructed of two-inch-diameter' Sche f. <br /> dule 40 PVC.casing <br /> and screen with 0.020-inch-wide slots (Figure 4). Two of the SVE wells will be h� - <br /> screened from - approximately 20 to 30 feet b <br /> gs, within the ,sand layer <br /> encountered in monitoring wells MW-1 through MW-3. The other two wells <br /> will be screened fromapproximately 35 to 45 feet bgs in more fine-grained, <br /> material which underlies the sand. <br /> 2.4 SVE Pilot Testing <br /> :After'the SVE wells have been installed, Clearwater will conduct a pilot test to . <br /> measure vacuums at the test wells; vacuums in. surrounding wells, flow <br /> rates, and the- concentrations of volatile compounds extracted. ,The objectives <br /> of conducting an SVE ilot test are to ob <br /> P taro information regarding `the radius <br /> of influence, the relative" pe'rrnieability •of strata, and. number of extraction <br /> wells required at the site. <br /> The testing will be conducted in'•accordance'with the protocols presented i n <br /> Appendix B. It is anticipated that the,extraction' test will be conducted using a^ <br /> 3'/4 horsepower regenerative,blower with extr ' <br /> acted soil vapor removed from <br /> the effluent air stream by passing 'the effluent through vapor,phase' granular <br /> activated carbon' (GAC): The GAC will be c <br /> arranged in series. ontained in 55-gallon drums <br /> . Twb..wells,'will be used as vapor extraction points; one that is screened in the <br /> sand layer, and another that is screened in the fine-grained strata beneath .it. <br />., Vapors will be extracted from, each'weil for.aeriod <br /> p of approximately three <br /> Q,105WP 7,95 �y <br /> t8 <br />