Laserfiche WebLink
('1EARWATER <br /> G ...R O ' U P, ' I N .C., ; <br />' 3.0 PROJECT REPORTS <br />' - <br /> Following the drilling of the soil borings and monitoring wells, a report will <br /> be submitted to'Present the results of the .analytical data. The report will- ' <br /> contain the information listed below: <br /> Text describing the investigative methods <br /> • Summary of,results and interpretation of findings <br /> Geologic boring logs. <br /> :Tables presenting soil and groundwater analytical results <br />' Maps depicting .contaminant distribution ' in groundwater and -.local <br /> groundwater flow direction <br /> • A'schedule for SVE pilot tests and groundwater.extraction tests <br /> 1D-105WP 7/95 <br />