My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
602
>
3500 - Local Oversight Program
>
PR0544148
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 6:16:53 PM
Creation date
2/14/2019 2:56:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544148
PE
3526
FACILITY_ID
FA0005937
FACILITY_NAME
NEAL STALLWORTH AUTO DETAIL
STREET_NUMBER
602
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13916509
CURRENT_STATUS
02
SITE_LOCATION
602 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> 25 July 2008 <br /> AGE-NC Project No. 99-0682 <br /> Page 2 of 6 <br /> pilottest. Therefore, on 10 June 2008, the EHD directed preparation ofanInterim Remediation Work <br /> Plan for SVE, based upon the lack of technical justification for the performance of a DPE pilot <br /> study. <br /> 2.0. SCOPE OF WORK <br /> Based on the results of the above-referenced SVE pilot tests performed at the site in July 2007, AGE <br /> proposes to install, operate and maintain an interim SVE remediation system utilizing existing SVE <br /> wells VW- 1 through VW-4. <br /> Interim remediation field activities will consist of the following tasks : <br /> • Pre-field work activities; <br /> • Installation of a soil vapor extraction system; <br /> • Soil vapor extraction system start-up period; <br /> • Monitoring and maintenance activities; <br /> • Progress/confirmation sampling; and <br /> • Report preparation. <br /> Each of these tasks is described in greater detail below. <br /> I '. <br /> 2, 1 . PRE-FIELD WORK ACTIVITIES <br /> Applicable site permits will be obtained from the City of Stockton (i.e., electrical, building, <br /> plumbing, etc.) and from the San Joaquin Valley Unified Air Pollution Control District (APCD). In <br /> addition, an update to the health and safetyplanpresently on-file will be prepared in accordance with <br /> Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (National <br /> Institute for Occupational Safety and Health Administration, U.S. Coast Guard and U.S . <br /> Environmental Protection Agency, 1985). Prior to mobilization, all underground trenching areas will <br /> be clearly marked and a utility clearance obtained through Underground Service Alert. <br /> 2 .2 . REMEDIATION WELLS <br /> Presently, SVE wells VW- I through VW-4 are located in the suspected core area of the petroleum- <br /> Advanced GeoEnvironmental, Inc. <br /> { .J <br />
The URL can be used to link to this page
Your browser does not support the video tag.