Laserfiche WebLink
I <br /> i <br /> CHRONOLOGY� <br /> EMIL' S LIQUOR ! <br /> 1405 CALIFORNIA STREET <br /> ESCALON CA 95320 <br /> i <br /> 07/.09/97 Three underground storage tanks removed this date under permit and <br /> inspection. Soil samples for analysis were collected from beneath the <br /> i tanks, dispensers and product piping lines <br /> 07/10/97 Notification of Hazardous Waste Discharge #97-090 submitted this date. <br /> 07/14/97 Preliminary analytical results were receive'id by Environmental Health <br /> (EHD). Soil samples from beneath the tanks were non-detect; dispenser <br /> and piping line samples had detections of TPH, BTEX and MtBE. <br /> i <br /> 07/18/97 Unauthorized Release (UAR) Report#97-U27 submitted this date. <br /> 02/09/98 Notice of Responsibility and Site Letter sent this date to both Responsible <br /> Parties: Robert Lease and Thomas Chack'o. The site letter included a <br /> directive to submit a work plan to begin the site investigation. <br /> 08/25/98 Date of Preliminary Site Assessment Worki plan. <br /> 08/28/98 Work plan approved by EHD. <br /> 09/22/98 Field work this date. Five geoprobe soil borings,jall met refusal, only one <br /> soil sample collected at 10 feet below surface grade (bsg); will need to <br /> return to complete investigation with hollow stem auger(HAS) drill rig. <br /> 12/04/98 Date of Preliminary Site Assessment Activities Report on work performed <br /> 9/22/98. <br /> 01/28/99 Field work to continue this date with limitediiaccess HSA rig. With second <br /> boring driller hit a product line near a dispenser. <br /> 01/29/99 Notification of Hazardous Waste Discharge!#99-013 and UAR Report <br /> #99-1.109 submitted this date. ► <br /> j <br /> 02/01/99 Hand augured borings performed to get soil samples from native soil I <br /> beneath the area of the line rupture. <br /> 11/15/99 EHD letter directing the submittal of a new work plan to continue <br /> the site investigation. The previous work plan was never fully <br /> implemented, but changes in site conditions require additional and <br /> possibly different work. Work plan due December 10, 1999. <br /> 12/14/99 EHD 14-day letter sent to Responsible Parties re:;submittal of a <br /> work plan to continue the site investigation.'' i <br />