My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 2:21:21 PM
Creation date
2/15/2019 1:30:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Clint Harms [charms@secor.com] <br /> Sent: Monday, September 22, 2003 3:21 PM <br /> To: Mike Infuma [EH] <br /> Cc: Ed Ralston; kfesoras@secor.com; tparker@secor.com <br /> Subject: Status of Circle K 1205, 16470 Cambridge Street, <br /> Mike: The following is the status of Circle K 1205: <br /> 1. ConocoPhillips was granted access to sample the well at the Lathrop Grammar School. Manteca Unified <br /> School District signed the agreement on 9/18/2003. SECOR is currently working with the school district to <br /> arrange a time and date to sample the well. SECOR has confirmed that the well operates from 9 pm to 7 <br /> am for irrigation at the school. SECOR will be arranging to sample the well between 7 and 8 am. I will <br /> contact you again when a date and time have been confirmed so you can be onsite during sampling if you <br /> would like. <br /> 2. Downgradient well MW-16 was installed on September 11 and developed and sampled on September 15. <br /> Installation of this well will be documented in a Site Conceptual Model due October 30 (45 day from the <br /> end of field work). <br /> 3. During the week of October 6-10, SECOR will be installing transducers into 4 offsite wells and one onsite <br /> well to monitor groundwater elevations for a period of four days and determine if groundwater elevations <br /> fluctuate with the use of the irrigation well at Lathrop Grammar School. <br /> If you have any questions please give me a call. <br /> Clinton Harms <br /> Project Scientist <br /> SECOR International <br /> charms@secor.com <br /> 916-861-0400 ext 228 <br /> 916-861-0430 fax <br /> 9/22/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.