My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 2:31:10 PM
Creation date
2/15/2019 1:45:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Mike Infurna [EH] <br /> Sent: Tuesday, September 01, 2009 9:27 AM <br /> To: 'Harms, Clint' <br /> Subject: RE: Circle K 1205, Lathrop <br /> thanks. <br /> so it appears you were approved to Pilot test in Nov 08 and now Sep 09 you're <br /> getting close? <br /> see my confusion? <br /> after 6-8 months, I forget....and the SWRCB wonders why it takes 20 years to get a <br /> site to closure... <br /> From: Harms, Clint [mailto:Clint.Harms@stantec.com] <br /> Sent: Monday, August 31, 2009 2:26 PM <br /> To: Mike Infurna [EH] <br /> Subject: Circle K 1205, Lathrop <br /> Mike— I went back and reviewed Stantec's submittals and EHD's responses. The following is a summary: <br /> y Submitted Results of Remedial Well Installation and Ozone Bench Test, July 27, 2008 <br /> EHD responded with August 6, 2008 letter requesting a pilot test. <br /> r Submitted Work Plan for Remedial Pilot Testing dated September 5, 2008 <br /> ➢ EDH responded with September 25, 2008 letter that the Work Plan for Remedial Pilot Testing was <br /> inadequate. <br /> Submitted Revised Work Plan for Remedial Pilot Testing dated Oct 20, 2008. <br /> EDH responded with Nov. 5, 2008 approving Revised Work Plan for Remedial Pilot Testing <br /> We now have an Authority to Construct the remedial system from San Joaquin Valley APCD, a building <br /> permit ready for pick-up with the City of Lathrop, and a contract for utility connection with PG&E to install <br /> the onsite portion of the SVE and Ozone sparge system. From EHD's letter dated August 6, 2008 it looks <br /> like the RWQCB just wanted a pilot test at the site based on the bench test conducted and no WDR at this <br /> time. I will get you a construction schedule for the installation of the remedial system in the next week or so <br /> and then I can prepare a schedule for the 6 months of pilot testing that was outlined in the Revised Work <br /> Plan for Remedial Pilot Testing. <br /> Clinton Harms <br /> Senior Scientist <br /> Stantec <br /> Ph: (916)861-0400 Ext.228 <br /> Fx: (916)861-0430 <br /> Cell: (916)826-4186 <br /> Clint.Harms@stantec.com <br /> stantec.com <br /> The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted,or <br /> used for any purpose except with StanteCs written authorization. If you are not the intended recipient, please delete all <br /> copies and notify us immediately. <br /> j Please consider the environment before printing this email. <br /> 1/27/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.