My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000771
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000771
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 5:26:59 PM
Creation date
2/15/2019 2:09:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000771
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CLEANUP AND ABATEM,-4T ORDER NO 5-00-704 5 <br /> FORMER CHEVRON STATION #9-5775 <br /> 301 VEST KETTLEMAN LANE <br /> D1, SAN JOAQUIN COUNTY <br /> Quarterly Reporting <br /> 11 By 15 July 2000, and the 15th day of the month following each calendar quarter, submit a <br /> quarterly progress report for the former Chevron Station #9-5775 site that provides the results of <br /> groundwater monitoring, sample analysts and site work performed during the previous calendar <br /> ' quarter Groundwater analysts is to include total petroleum hydrocarbons as gasoline. benzene, <br /> toluene, ethyl benzene, total xylenes, ethylene dtbromtde, 1,2-dtchloroethane, MtBE, TB 4, <br /> DIPE, ETBE, TAME, ethanol, and methanol The quarterly progress reports shall tn::lude <br /> a Groundwater elevation contour maps <br /> b Pollutant concentration contour maps <br /> ' c Groundwater purge data sheets <br /> d Tabular results of current and all previous data <br /> e Narrative descnbtng the work presented to the report, including methodology <br /> f Discussion of the status of investigation and cleanup activities <br /> a Evaluation of the effectiveness of cleanup activities and an estimate of pollutants treated <br /> versus pollutants remaining <br /> ' h A schedule for future activities <br /> t Include data from the last three months, document treatment or disposal of ark <br /> contaminated soil or groundwater generated dunng the investigation and cleanup <br /> activities <br /> 12 If groundwater monitoring indicates the groundwater plume has migrated beyond laterally or <br /> ' vertically defined ltnuts dunng the quarter, the quarterly report shall include a work pian and <br /> schedule,with work to begin wtthtn tlurty days of report submittal, to define the new plume <br /> ltmrts <br /> ' TON, Exerutit a OfFicer <br /> Dated 20 April 2000 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.