My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000772
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 4:01:25 PM
Creation date
2/15/2019 2:11:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000772
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r .. <br /> Former Chevron Station <br /> 301 West Kettleman Lane, Lodi ;` - 2 - 13 March 2002 <br /> extraction wells south of Kettleman Lane are not necessary at this time As an interim measure, Secor proposes <br /> to complete batch extraction at all monitoring wells south of Kettleman Lane when concentrations of MtBE are <br /> confirmed to be above 5 pg/1 Board staff agree with this approach, and the 9 January 2002 FRP Addendum is <br /> approved <br /> As presented in the Q4-2001 Report,remedial system influent concentrations are declining Attached Figures 6 <br /> and 8 from the Q4-2001 Report show the cumulative mass removed for MtBE in groundwater is starting to <br /> flatten out, and the cumulative mass removed for MtBE in soil vapor is flat Based on this information, it is <br /> appropriate to optimize the SVE system by reconfiguring or pulsing the SVE system to continue removing more <br /> contaminant mass Please include a SVE optimization plan with the second quarter(Q2-2002) status report, <br /> which is due by 15 July 2002 <br /> Secor recommended continued operation of the SVE and GET remedial systems and continued quarterly <br /> monitoring and sampling Board staff concur with these recommendations The groundwater extraction must <br /> continue to stabilize the groundwater plume and prevent movement of MtBE toward City Well #12 if you have <br /> any questions or comments, please call me at(916) 255-3115 <br /> Marty Hartzell, R G <br /> Associate Engineering Geologist <br /> Attachment <br /> cc Mr Mark Owens, SWRCB,UST Cleanup Fund, Sacramento <br /> Mr Harlin Knoll, San Joaquin County Environmental Health Division, Stockton <br /> Mr David Evans, Secor International Incorporated, Sacramento <br /> Mr Frank Beeler, City of Lodi Water Department, Lodi <br />
The URL can be used to link to this page
Your browser does not support the video tag.