Laserfiche WebLink
CLEANUP AND ABATEMA ORDER NO. 5-00-700 • • 6 <br /> FLAG CITY CHEVRON <br /> 6421 CAPITOL AVENUE <br /> LODI, SAN JOAQUIN COUNTY <br /> Quarterly Reporting (continued) <br /> 1,2-DCA, MtBE, TBA, DIPE, ETBE, TAME, ethanol, and methanol. The quarterly progress <br /> reports shall include: <br /> a. Groundwater elevation contour maps <br /> b. Pollutant concentration contour maps <br /> c. Groundwater purge data sheets <br /> d. Tabular results of current and all previous data <br /> e. Narrative describing the work presented in the report, including methodology <br /> f. Discussion of the status of investigation and cleanup activities <br /> g. Evaluation of the effectiveness of cleanup activities and an estimate of pollutants treated <br /> versus pollutants remaining <br /> h. A schedule for future activities <br /> i. Include data from the last three months, document treatment or disposal of any <br /> contaminated soil or groundwater generated during the investigation and cleanup <br /> activities. <br /> j. An update on the work completed to provide a permanent water source for Rocky's <br /> Restaurant and all other drinking water supplies that become affected by the discharge of <br /> petroleum hydrocarbon fuel from Flag City Chevron contamination plume(s). <br /> 15. If groundwater monitoring indicates the groundwater plume has migrated beyond laterally or <br /> vertically defined limits during the quarter, the quarterly report must include a work plan and <br /> schedule, with work to begin within thirty days of report submittal, to define the new plume <br /> limits. <br /> j <br /> 6AY,1KeCXRLTON, Executive Officer <br /> Dated: 1 March 2000 <br />