My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000683
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:05:27 PM
Creation date
2/15/2019 3:59:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000683
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Mr Richard Bolas - 3 - d November 2006 <br /> Nk Nick Dm,gsa <br /> 1 <br /> • <br />' GENERAL LNFORNIATION AND REQUIR.EI�TS <br /> General Order No 5-00-119 (enclosed)prescribes mandatory discharge monitoring requirements for <br />' compliance with the General Order The project activities shall be operated in accordance with the <br /> requirements contained in the General Order and with the information subnutted m the application <br />' packet <br /> As required within Attachment_B (Monitoring and Reporting Program, MRP) of enclosed General Order <br />' 5-00-119, the upstream and downstream receiving water location (R-1 and R-2, respectively) shall be <br /> approved by Board staff. The present proposed receiving water locations are 50 feet up and 50 feet <br /> downstream of the point of discharge into Coldam Ditch. Within 5 working days of receipt of thus <br />' NOA, the Discharger or appropriate representative skull schedule with Board staff to conduct a site <br /> inspection and estabhsh appropriate receiving water sample locations. <br />' The NIRP sets forth mandatory monitoring requirements; however, additional monitoring has been <br /> deemed necessary by staff The Regional Board requires that the effluent and receiving water be <br /> monitored for nitrates on a monthly basis Nitrate results shall be included in the required self- <br />' monitoring reports as specified in the MRP <br /> Regional Board staff has been notified of the time schedule to implement the project. Additionally, the <br /> lie Regional Board shall be notified immediately if any nuisance or detriment to the receiving waters is <br /> observed during the implementation of the project. Failure to abide by the conditions of the General <br /> Order could result in an enforcement action as author-zed by provisions of the California.Water Code. <br />' T"ne required annual fee ass ecif.ed m the annual bffl o will( p g you 11 receive from the State Nater <br /> Resources Control Board) shall be submitted until this Notice of Applicability is officially ter=ated. <br /> Please notify this office in writing when the project has been completed and the discharge is no longer <br /> necessary, so we may terminate applicability of this general order. <br /> If you have any questions or comments regarding this notification, please contact Mr. Marty Hartzell <br /> (916) 255-3115 or Robert Fagerness (916) 255-3022 of my staff. <br /> 11,E GARY M CARLTON <br /> Executive Officer <br /> GMC.nf <br /> Enclosures General Order No 5-00-119 <br /> . Standard Provisions <br /> CC List attached <br />
The URL can be used to link to this page
Your browser does not support the video tag.