Laserfiche WebLink
CLE ANUP AND ABATEMEN ORDER NO 5-00-700 5 <br /> FLAG CITY CHEVRON <br /> �6421 CAPITOL AVENUE <br /> LODI SAN TOAQUIN COUNTY <br /> Site-Specific Investigation and Cleanup Tasks (continued) Compliance Date <br /> 7 Submit a complete Problem Assessment Report (PAR) acceptable to the 19 June 2000 <br /> Board and County staff, as described in Appendix A of the Tri-Regional <br /> Recommendations (enclosed as part of this order) The PAR must <br /> include requirements for any discharge permits and a time line for <br /> submittal of a Report of Waste Discharge <br /> S Within 15 days of Board staff approval of the Problem Assessment 31 July 2000 <br /> Report, but no later than 31 July 2000, submit a Final Remediation Plan <br /> (described in Appendix A) for the cleanup of the soil and groundwater at <br /> the site <br /> 9 Within 30 days of Board staff approval of the selected Remedial Option, 1 September 2000 <br /> but no later than 1 September 2000, implement and continuously <br /> operate, the approved remediation system, with the exception of <br /> periodic and scheduled maintenance Any interruption in the operation <br /> of the cleanup system(s), other than for scheduled maintenance, without <br /> prior approval of the Executive Officer, is a violation of this Order <br /> Reporting and Permits <br /> 10 Notify the Board and County staff at least two business days prior to any site work or sampling <br /> 11 Obtain all necessary local and state permits prior to beginning work <br /> 12 Submit all reports and correspondence to the Board's Sacramento Office, the San Toaquin <br /> County Environmental Health Division, and all parties (or representatives) identified in this <br /> Order Under penalty of perjury, the technical reports as directed, which shall be submitted to the <br /> Executive Officer of the Board, and to the County, must be signed by an appropriately licensed <br /> professional (technical reports and plans, including drilling logs and soil and groundwater <br /> sampling, are to be prepared, signed, and certified by a Registered Geologist, Registered Civil <br /> Engineer, Certified Engineering Geologist, or Certified Hydrogeologist) All registered <br /> professionals must be licensed by the State of California <br /> 13 Submit preapprovals with workplans and all reports with reimbursement requests to the State <br /> Water Resources Control Board Cleanup Fund in a timely manner to avoid delays that would <br /> result in non-compliance with flus Order <br /> Quarterly Reporting <br /> 14 By 15 April 2000, and the 15`h day of the end of each following calendar quarter, submit a <br /> quarterly progess report for the Flag City Chevron site work that provides the results of <br /> groundwater monitoring and sample analysis and site work performed during the previous <br /> calendar quarter Groundwater analysis is to include total petroleum hydrocarbons as gasoline, <br /> total petroleum hydrocarbons as diesel, benzene, toluene, ethyl benzene. total xylenes, EDB, <br />