My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000697
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000697
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 7:15:49 PM
Creation date
2/15/2019 4:15:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000697
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEANUP AND ABATEMEP,. ORDER NO 5-00-700 <br /> FLAG CITY CHEVRON <br /> 6421 CAPITOL AVENUE <br /> LODI SAN TOAQUIN COUNTY <br /> Quarterly Reporting (continued) <br /> 1,2-DCA, MtBE, TBA, DIPS, ETBE, TAME, ethanol, and methanol The quarterly progress <br /> reports shall include <br /> a Groundwater elevation contour maps <br /> b Pollutant concentration contour maps <br /> c Groundwater purge data sheets <br /> d Tabular results of current and all previous data <br /> e Narrative describing the work presented in the report, including m--thodology <br /> f Discussion of the status of investigation and cleanup activities <br /> g Evaluation of the effectiveness of cleanup activities and an estimate of pollutants treated <br /> versus pollutants remaining <br /> h A schedule for future activities <br /> i Include data from the last three months, document treatment or disposal of any <br /> contaminated soil or groundwater generated during the investigation and cleanup <br /> activities <br /> 1 An update on the work completed to provide a permanent water source for Rocky's <br /> Restaurant and all other drinking water supplies that become affected by the discharge of <br /> petroleum hydrocarbon fuel from Flag City Chevron contamination plume(s) <br /> 15 If groundwater monitoring indicates the groundwater plume has migrated beyond laterally or <br /> vertically defined lunits during the quarter, the quarterly report must include a work plan and <br /> schedule, with work to begin within thirty days of report submittal, to define the new plume <br /> limuts <br /> Y te C TON, Executive Officer <br /> Dated 1 March 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.