My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CARDINAL
>
205
>
2900 - Site Mitigation Program
>
PR0527434
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2019 1:16:28 PM
Creation date
2/22/2019 11:33:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527434
PE
2950
FACILITY_ID
FA0018579
FACILITY_NAME
STOCKTON TERMINAL & EASTERN RR
STREET_NUMBER
205
Direction
N
STREET_NAME
CARDINAL
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14330007
CURRENT_STATUS
01
SITE_LOCATION
205 N CARDINAL AVE WEBER
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' September 2007 • padre <br /> aaaoelataa, ine. <br /> Project No.0701-2621 ® FH ROHMENO•lOEC1EN niB <br /> 4.0 SCHEDULE <br /> ' The proposed scope of services will require approximately four to six weeks to <br /> ' complete. Permit acquisition will require one to two weeks. The field assessment activities will <br /> require one week, and chemical analyses of the soil samples collected will be available within <br /> one to two weeks. The report will be prepared within two weeks of completing the fieldwork and <br /> ' receiving the results of the laboratory analyses. <br /> 1 <br /> t <br /> O].2831.TWP.Eoc <br /> - 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.