Laserfiche WebLink
Woodward-Ae W <br /> Engineering a sciences applied to the earth 8 its environment <br /> February 28, 1995 <br /> WMGT <br /> Mr. Lee Clifford Mr. Bryant Taylor <br /> Director of Plant Engineering Environmental Specialist <br /> Olin Aegis Olin Chemicals <br /> % Olin Interconnect P.O. Box 248 <br /> 544 Industrial Park Drive Lower River Road <br /> Manteca, CA 95336 Charleston, TN 37310 <br /> FAX (209) 239-2660 FAX (615) 336-4505 <br /> Gentlemen: <br /> Confirming our meeting at Olin Interconnect's Manteca, California facility on February 27, <br /> 1995 Woodward-Clyde Consultants (WCC) is pleased to present our proposal to Olin <br /> Corporation (Olin) to install four groundwater monitoring wells at your proposed new facility <br /> location. Our attached cost proposal covers the following items: <br /> • Site visit to locate wells and discuss access <br /> • Obtain well permits <br /> • Use of a utility locator service for each of the well locations, to mark underground <br /> utilities, Olin to work with property owner to supply utility plans, if available <br /> • Sub-contractor costs for drilling <br /> • Installation of four each 2-inch PVC wells, with two bollards per well, locking <br /> caps for each well, and each well completed 18 inches above grade, exact <br /> locations to be supplied by Olin <br /> • WCC supervision of drilling, and WCC logging of wells <br /> • WCC well development and sampling of four soil and one groundwater sample per <br /> well <br /> • Analytical costs five day turn-a-round for 16 soil and four groundwater samples <br /> analyzed for the following: <br /> - Soil - priority metals, cyanide, and pH <br /> - Groundwater - priority metals, cyanide, volatile organic compounds and semi- <br /> volatile compounds <br /> H\HUNl'8R\PR0\0LIN.001\1 °CO228951627 <br /> Woodward-Clyde Consultants•A subsidiary of Woodward-Clyde Group,Inc. <br /> 500 12th Street,Suite 100.Oakland,California 94607-4014 <br /> 510-893-3600 Fax 510-874-3268 <br />