Laserfiche WebLink
Woodward-Clyda <br /> Mr. Lee Clifford <br /> Mr. Bryant Taylor <br /> February 28, 1995 <br /> Page 2 <br /> • Letter report of above activities <br /> We are recommending that 16 soil samples or foun.per well be taken to better characterize <br /> the soil column. <br /> The above services are quoted on a time and materials basis using our existing national <br /> contract rates. We will not exceed our cost estimate without prior written notification of <br /> Olin. We are prepared to start field work on this project with approximately four workdays <br /> notification, assuming rapid tum-a-round of the required well permits. <br /> We can provide the following additional services to Olin as needed, under a follow-on Scope <br /> of Work. <br /> • Long term groundwater monitoring <br /> • Tiered Permitting closure plan development or review of existing plans with <br /> professional engineer certification <br /> I would be happy to discuss this proposal with you in greater detail at your convenience. <br /> The Scope of Work can be adjusted, as needed, 1to, fit Olin's needs. Thank you for the <br /> opportunity to work with you on this project. <br /> Sincerely yours, <br /> Joe Morgan III Christopher L. Vais <br /> Senior Project Manager Vice President <br /> cc: Mr. Chris Vais, WCC Oakland, CA <br /> Mr. Bill Loskutoff, WCC Sacramento, CA <br /> Mr. Richard Young, WCC Franklin, TN <br /> HAHUNT&RTRO\OLIN.001\2 - <br /> 0O228951627 <br />