My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012559
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
3500 - Local Oversight Program
>
PR0544166
>
ARCHIVED REPORTS XR0012559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:01:25 PM
Creation date
2/22/2019 1:52:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012559
RECORD_ID
PR0544166
PE
3528
FACILITY_ID
FA0005252
FACILITY_NAME
GREYHOUND LINES INC
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730011
CURRENT_STATUS
02
SITE_LOCATION
121 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> k <br /> at3t.Cz 1' '_ejd i7asn <br /> '?"n hands and face. <br /> `•;ecesnary eauLpmenr ;:c;uaes: <br /> - 1• Mater <br /> 2. saao <br /> 3• "abler <br /> 4• Was" basins or bucrets <br /> 5• Z lean teve is <br /> S-tatsort 12: Redre,„ <br /> r= re-enterinsa rxciaslon Zone out on clean :seld ciatries (e.q., <br /> yvex, gloves. atc.�, <br /> .� Necessary e-qu3.= ent �zciudes: <br /> i <br /> Tame <br /> -- 2• Clothing <br /> t 4.2.z Faul=ent Oentazinatien <br /> _ rill riga will be steam cleaned and drilled equipment will be <br /> =µ* decantamznated prior to moven - <br /> g to a site. drilling equxpment used for <br /> lmilt;aie boreholes will be de4entaminated prior Cti drilling earn baring <br /> at '.e site. :he equipment u"1 be decantamsnated in eila follovynq <br /> rr:asu'►or: <br /> a The driiling rig will be steam cleaned to remove gross <br /> ! " cont ma^-ation. <br /> 6o+rnhola <br /> equipment (auger bits, drill rods, split spoon', etc.) <br /> will be steam cleaned to remove gross contceurration. <br /> '^ a buy, r-he downhole equipment will be air dried. <br /> drill.r.y sequence heirarcny (from lase L_'kejy to more Likely <br /> =ani+;Hared borsnq Zotauons) will be i=Vczed tc reduce t,a oocential <br /> Jfor cross contaminat;on. <br /> All samaljag =quxoment wLi be decoMrzm nated prior ,o use it each <br /> Sammi:a lOc3tz•Cn. Tae mar-todology used to decontamzrxated sann"nq <br />
The URL can be used to link to this page
Your browser does not support the video tag.