My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Marley Cooling Tower Company <br /> Work Plan for Mitigation Activities - Update <br /> May 13, 1987 <br /> Page 6 Item 2 : First Paragraph- <br /> 1. The statement " . . .Subsurface vadose zone. . . It <br /> is redundant; vadose zone is by definition, <br /> subsurface. <br /> 2 . The statement "No additional sampling is <br /> necessary" should be qualified, i.e. , further <br /> sampling for mitigation alternative <br /> evaluation may not be needed, however, <br /> further sampling for characterization (as <br /> presented in attachment 2) is required. <br /> Page 2-2 South Yard Drainage Ditch Soil - <br /> 1. The proposed sampling depths (0 . 5, 2 , and 4 <br /> feet) are without reference, please specify. <br /> 2 . Sample location #9 is confusing. Figure 2-2 <br /> indicates the sample will be on the shoulder <br /> of the ditch where as the written description <br /> implies the sample will be taken from the <br /> bottom. <br />
The URL can be used to link to this page
Your browser does not support the video tag.