Laserfiche WebLink
Marley Cooling Tower Company <br /> Work Plan for Mitigation Activities - Update <br /> May 13, 1987 <br /> Page 6 Item 2 : First Paragraph- <br /> 1. The statement " . . .Subsurface vadose zone. . . It <br /> is redundant; vadose zone is by definition, <br /> subsurface. <br /> 2 . The statement "No additional sampling is <br /> necessary" should be qualified, i.e. , further <br /> sampling for mitigation alternative <br /> evaluation may not be needed, however, <br /> further sampling for characterization (as <br /> presented in attachment 2) is required. <br /> Page 2-2 South Yard Drainage Ditch Soil - <br /> 1. The proposed sampling depths (0 . 5, 2 , and 4 <br /> feet) are without reference, please specify. <br /> 2 . Sample location #9 is confusing. Figure 2-2 <br /> indicates the sample will be on the shoulder <br /> of the ditch where as the written description <br /> implies the sample will be taken from the <br /> bottom. <br />