Laserfiche WebLink
o Is an evaluation of the alternatives ' Yes No <br /> consistency with state and federal <br /> regulations included in the draft RAP? <br /> o Does the draft RAP contain a detailed <br /> discussion of each alternative considered, <br /> and rationale for selection of the proposed <br /> alternative? <br /> o Does the RAP specify clean-up levels, and <br /> state how determined? <br /> o If applicable, does the draft RAP contain <br /> a schedule and details on 0 & M require- <br /> ments and/or deed restrictions? <br /> o Does the draft RAP contain a schedule for <br /> implementing the selected alternative? <br /> o Does the draft RAP estimate quantities of <br /> material requiring off-site disposal/treat- <br /> ment/etc? <br /> o Does the draft RAP discuss <br /> 1. public health, 2 . environmental , <br /> 3 . technical, and 4 . community relations <br /> concerns for each alternative? <br /> Public Notice Requirements <br /> (To be met in circulating draft RAP for review, before response <br /> to public comments and approval of final RAP) <br /> o Has the responsible party prepared a Yes No <br /> sufficient number of copies of the draft <br /> RAP for public circulation (minimum 25 <br /> copies, depends on specific site) ? <br /> o Have 15 copies of the draft RAP been <br /> sent to the State Clearinghouse for <br /> distribution for a 30-day public review <br /> period? <br /> o Have copies of the draft RAP been sent <br /> to all public agencies who have <br /> jurisdiction by law regarding the proposed <br /> alternative? <br /> o Has a notice of the proposed remedial <br /> action been published in a newspaper of <br /> general circulation in the project area? <br />