My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 <br /> July 16 , 1987 <br /> Mr. Jim Austreng � ��� <br /> De rtmen o Healt�Serv�i�es <br /> Tox c S stann Road nc C <<�1 21 9887 <br /> 44 <br /> Sacrramento,ICA 95826 ENF�ROMENTALlT1SER HEAD <br /> ERM17/SERVlC�s TM <br /> RE: Progress Report-Stockton Assessment Program <br /> Dear Mr. Austreng: <br /> This report summarizes the activities at the Stockton facility <br /> from June 1, 1987 to July 1, 1987 . <br /> I. Pond Closure <br /> A. Construction - the water treatment plant <br /> is scheduled to be substantially completed <br /> by July 10 , 1987 . <br /> B. Training and Start-Up - The start-up of <br /> the water treating plant, with vender <br /> service engineer is scheduled for weeks <br /> of July 20 and July 27 . Operator training <br /> will also take place at this time. In- <br /> structions will be provided by Vender (IDI ) <br /> and Marley' s consultant (Black & Veatch) . <br /> C. Pond Water Removal - It has been determined <br /> that it will be necessary to remove the fine <br /> silt from the pond water before it is treated <br /> in the Ion Exchange Unit. Alum will be added <br /> to the pond water at a rate of 25-35 mg/1. <br /> After a mixing period the water will be left <br /> undisturbed for several days while the silt <br /> settles out. The current schedule for this <br /> is : <br /> Coagulation 7/20-7/27 <br /> Settling 7/27-8/3 <br /> Start of water removal 8/3 <br /> MARLEY <br /> the _ <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.