Page 2 <br /> II. Ground Water Assessment <br /> A. Extraction Well - The pilot extraction well <br /> and the well development is complete. <br /> B. Aquifer Test - The RWQCB has approved the <br /> one time use of the storm water pond to <br /> store the ground water from the aquifer <br /> test. This will allow the aquifer test <br /> to be done in July rather than late in <br /> August. This will result in a 4 to 6 <br /> weeks earlier start in the design of the <br /> ground water recovery network. The force <br /> main to storm water basin is to be complete <br /> by July 10 . The aquifer test to begin as <br /> soon as possible after the force main is <br /> completed (week of July 13 or before) . <br /> C. NPDES Permit - The revised permit has been <br /> sent to interested parties and is scheduled <br /> for hearing before the Board on August 14 . <br /> D. Quarterly Samples - Samples will be taken <br /> in July by Hargis & Kleinfelder. The results <br /> of the lysimeter sampling taken April 10 , <br /> 1987 are attached. <br /> III. Soil Samples - South Yard Ditches - Draft of <br /> report is being reviewed and should be ready for <br /> release by week of July 20 . <br /> IV. Domestic Water Well Tests - Hargis will resample <br /> the domestic wells that were sampled in the original <br /> ground water assessment. In addition a domestic <br /> well at 328 N. Lillian and the Calif. Water Service <br /> -Well No. 200-01 will be sampled. This will occur <br /> the week of July 6 and July 13 . <br /> V. Schedule - The schedule is essentially the same <br /> as the June 4 , 1987 revision which was included in <br /> the June 1 progress report. <br /> Please advise if you have any questions. <br /> . cerely, <br /> THE MARLEY COOLING TOWER COMPANY <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB/jel <br /> Attachment <br />