My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
llnnll <br /> THE MARLEY COOLING TOWER COMPANY <br /> A 19&7- <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 <br /> ENVIROMENTAL HEALTH <br /> FERMIT/SERVICES <br /> June 1 , 1987 <br /> Mr: Jim Au <br /> De t. of a 1 t h rvices <br /> Tox-c Su stances C trot Div. <br /> 441 Po er Inn Road <br /> Sacramento, CA 95826 <br /> RE: Progress Report-Stockton Assessment Program <br /> Dear Mr. Austreng: <br /> This report summarizes the activities at the Stockton facility from <br /> April 9, 1987 to June 1 , 1987. <br /> I. Pond Closure <br /> A. Construction <br /> 1 . Perimeter Curb <br /> Asphalt work has been completed and the perimeter <br /> curb is complete. <br /> 2. Sludge Basin and Flow Equalization Basin <br /> The concrete work on the flow equalization basin <br /> is complete. The concrete work on sludge basin <br /> should finish this week (week of June 1 ) . <br /> 3. Ion Exchangers <br /> All changes as a result of the switch in process <br /> order, have been approved and most material is on <br /> hand. Piping and electrical work is now rapidly <br /> being completed. <br /> 4. Construction Schedule <br /> Completion of the treating plant is scheduled for <br /> early July. <br /> MARLEY <br /> the '' <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.