Page 2 Cont. <br /> II . Phase III - Ground Water Assessment <br /> A. Phase III Report <br /> The Phase III Report was mailed to all agencies on May <br /> 15, 1987. <br /> B. Extraction Well <br /> Construction of the pilot extraction well is scheduled <br /> to start June 8, 1987, pending approval of the DHS. <br /> Aquifer test will not be conducted until the NPDES permit <br /> is approved. The water removed from the extraction well <br /> during the well development will be taken to the storm water <br /> retention pond. (this has been standard procedure for all <br /> monitor well development) . Well details have been submitted <br /> to the DHS. Hargis will furnish additional information as <br /> required. Pipe line details , to transport water from extraction <br /> well to the water treating plant, will be available in near <br /> future. <br /> C. NPDES Permit Revision <br /> Application for revised permit has been submitted and response <br /> from the RWQCB has been received. Revised application, <br /> additional information and comments will be submitted by June <br /> 5, 1987. <br /> Next Board Meeting is scheduled for August 14, 1987. This <br /> is the earliest NPDES Permit can be approved and Aquifer test <br /> can begin. <br /> D. Quarterly samples. <br /> Results of monitor wells samples taken week of April 20 <br /> are attached. <br /> III . Soil Samples - South Yard Ditches <br /> Samples have been taken as outlined in work plan. The report <br /> should be available by June 12, 1987. <br /> IV. Domestic water well tests <br /> The off-site sampling program for domestic water wells will <br /> be repeated. This was originally done in April of 1985 and <br /> will be done following the same procedure used in 1985. Unless <br /> someone knows of additional wells , that can be tested, the <br /> original five (5) wells will be re-tested. <br />