Laserfiche WebLink
Page 3 Cont. <br /> V. HAR Submittal <br /> The Hydrogeologic Assessment Report for the storm water <br /> retention pond was submitted to the Water Quality Control <br /> Board on April 27, 1987 <br /> VI . Schedule <br /> Revised schedule is attached. <br /> Please advise if you have any questions. <br /> Sincerely, <br /> THE MARLEY COOLING TOWER COMPANY <br /> CZOL-�'a, Lo . q� <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB/jel <br /> Attachment <br /> cc's: Mr. Robert Fujii-CRWQCB <br /> Mr. Marvin Young-EPA <br /> Ms. Jeanine Jones-DOHS <br /> Ms. Laurie Cotulla-S.J.L.H.D. <br /> Mr. Larry Schaper-Black & Veatch <br /> Mr. Thomas Hickey-Black & Veatch <br /> Mr. Peter Quinlan-Hargis & Assoc. <br /> Mr. Richard Landon-MCTC <br /> Mr. Wayne Struchtemeyer-MCTC <br /> Mr. Tim Verhagen-TMC <br /> Mr. Hal Daley-MCTC, Stockton <br />