My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD - CENTRAL VALLEY REGION <br /> 3443 Routier Road Phone: (916) 361-5600 <br /> Sacramento, CA 95827-3098 ATSS: 8-495-5600 <br /> TO: Greg K. Vaughn FROM: Bob Fujii <br /> Sr. Engineer, TPCA Unit Assoc. Engineer, <br /> TPCA Unit <br /> DATE: 30 April 1987 SIGNATURE: <br /> SUBJECT: Marley Cooling Tower Company, NPDES Permit Review <br /> Based on our review of your NPDES permit application we have <br /> developed the following comments. <br /> Item 1 USEPA Form 2D <br /> It is recognized that the omitted forms may not have changed from <br /> your original application. However, to avoid any confusion and <br /> delays in the review process all of the NPDES forms should be <br /> submitted to our agency and EPA (ie. Ken Greenberg, Section Chief, <br /> Permits and Pretreatment section) so that your application can be <br /> processed through all the regulatory agencies. <br /> In addition, you are also required to submit fees to cover the cost <br /> of revising your existing NPDES Permit. Your application will not <br /> be considered complete until these fees are submitted. A fee <br /> schedule is enclosed for your information. <br /> Item 2 Comments and Suggested Revisions to the Existing Permit <br /> Revision 1. <br /> This revision will be incorporated into the existing permit. <br /> Revision 2 . <br /> MCTC requested that the maximum flow in their existing NPDES permit <br /> be increased from 1. 19 mgd to 1. 31 mgd. MCTC is proposing to <br /> construct the treatment facility in two stages. The first stage will <br /> have a capacity of 0. 37 mgd and the second a capacity of 0. 94 mgd. <br /> The total plant capacity after the expansion will be 1.31 mgd. When <br /> the original NPDES Permit was drafted it was assumed that the <br /> treatment plant would be constructed in a single stage with a <br /> capacity of 1. 19 mgd. Therefore, the flow limits (design capacity) <br /> for the revised permit should be set at 0. 37 mgd (first stage <br />
The URL can be used to link to this page
Your browser does not support the video tag.