My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9ru�, ).1 ) <br /> APR 21 :'; <br /> ; - <br /> THE MARLEY COOLING TOWER COMPANY GNVIR04nE!vTAL HEALTH <br /> 5800 Foxridge Drive/P.O. Box 29127Mission, Kansas 66201/Telephone: (913) 362.1818 <br /> April 17 , 1987 <br /> Vt- <br /> ustreng <br /> ealth vicesb tanc Co trol Div. <br /> e I Roadto, A 95826 <br /> RE: Progress Report-Stockton Assessment Program <br /> Dear Mr. Austreng: <br /> This report summarizes the activities at the Stockton facility from March <br /> 13, 1987 to April 8, 1987. <br /> I. Pond Closure <br /> A. Construction <br /> 1 . Perimeter Curb <br /> The asphalt portion of the curb still remains to be complete. <br /> This will be done in the near future. <br /> 2. Sludge Basin and Flow Equalization Basin <br /> The sand and gravel have been back filled above the <br /> secondary containment liner and construction has begun <br /> on the flow equalization basin. <br /> 3. Ion Exchangers <br /> The tanks are set and piping has been started. <br /> 4. Construction Schedule <br /> Completion of the treating plant is still scheduled for <br /> July 1 , 1987. <br /> II. Phase III - Ground Water Assessment <br /> A. Extraction Well <br /> ARL�Y <br /> O <br /> A MARLEY COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.