Laserfiche WebLink
Page 2 <br /> The proposed location of the pilot extraction well and details <br /> of the well construction are outlined in Pete Quinlan's letter <br /> of 3-27-87. Additional information will be included in the Phase <br /> III report. <br /> B. Phase II Report <br /> Final draft of the report is essentially complete and should be <br /> available in the near future. <br /> C. Future Action <br /> The quarterly sampling of the monitor wells will begin April 20. <br /> III. Surface Water Sample - South Yard <br /> The clean up of the south yard is essentially complete. Several crews <br /> worked on 2 Saturdays and continue to work thru the week. We should <br /> be ready for additional samples in the fall . <br /> IV. Schedule <br /> Revised schedule dated April 17 , 1987 is attached. <br /> V. Future Meeting <br /> The next meeting between Marley and State Agencies is scheduled for <br /> May 5, 1987 at 1 :30 P.M. at the Regional Water Quality Control Board <br /> Office, 3443 Routier Rd. <br /> Sincerely, <br /> THE MARLEY COOLING TOWER COMPANY <br /> �� �. <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB/jel <br /> cc's: Mr. Robert Fujii-CRWQCB <br /> Mr. Marvin Young-EPA <br /> Ms. Jeanine Jones-DOHS <br /> Ms. Laurie Cotulla-S.J.L.H.D*49. <br /> Mr. Larry Schaper-Black & Veatch <br /> Mr. Thomas Hickey-Black & Veatch <br /> Mr. Peter Quinlan-Hargis & Assoc. <br /> Mr. Richard Landon-MCTC <br /> Mr. Wayne Struchtemeyer-MCTC <br /> Mr. Tim Verhagen-TMC <br /> Mr. Hal Daley-MCTC, Stockton <br />