My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HARGIS -r ASSOCIATES, INC. <br /> Consultants in Hydrogeology <br /> 2223 Avenida De La Playa Suite Soo <br /> La oifa, =diforn�a 92037 <br /> March 27, 1987 <br /> RETURN RECEIPT REQUESTED <br /> Mr. David Bates <br /> MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive <br /> Mission, KS 66202 <br /> RE: Pilot Extraction Well <br /> Dear Mr. Bates: <br /> Pursuant to our letter of February 13, 1987, a preliminary design has <br /> been prepared for the pilot extraction well (Figure 1) . The pilot <br /> extraction well will be located on the South Yard adjacent to monitor wells <br /> MW-3, MW-9, and MW-322 (Figure 2) . The selection of a pump will require <br /> consultation with Black and Veatch to determine required delivery pressure, <br /> pipeline configuration, and pipeline friction losses. <br /> Pursuant to our conversation, construction of the pilot extraction well <br /> is now tentatively scheduled for June 1, 1987. Aquifer testing could begin <br /> by mid-June. The wellfield design will begin after aquifer testing. <br /> me. If you have any questions or wish further discussion, please contact <br /> Sincerely, <br /> HARGIS +,ASSOGTATES, INC. <br /> Peter T. Quinlan <br /> Project Hydrogeologist <br /> PTQ/bm <br /> Phoenix oRice: Tucson office: <br /> 2222 South Dobson Rood Suite 401 1735 East Fort Lowell Road Suite 5 <br /> Mesa. Arizona 85202 Tucson, Arizona 85719 <br /> (602) 345-0888 (602) 881-7300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.