Laserfiche WebLink
• , • • <br /> ( <br /> MAR 2 t( <br /> THE MARLEY COOLING TOWER COMPANY ENVIRnenEAn,,, <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 PERMIT/SERVICES, <br /> March 17, 1987 <br /> Mr. Jim Austrena <br /> Dept. of Health Services <br /> Toxic Substances Control Div, <br /> 4410 Power Inn Road <br /> Sacramento, CA 95826 <br /> RE: Progress Report - Stockton Assessment Program. <br /> Dear Mr. Austreng: <br /> This report is to summarize the activities at the Stockton <br /> facility from February 4, 1987 until March 13, 1987, <br /> I . Pond Closure <br /> A. Construction <br /> 1 . Perimeter Curb <br /> The perimeter curb is complete except for the <br /> asphalt portion at the railroad loading dock. <br /> This will be done when warmer weather is here. <br /> 2. Sludge Basin and Flow Equalization Basin <br /> The rain delayed installation of the liner until <br /> the week of March 2. The liner is in place and <br /> back fill of sand has started ( pictures were shown <br /> at our meeting on March 12) . <br /> 3. Force Main <br /> The 12 inch force main is complete to the building <br /> and will be tied into system when ion exchanges <br /> are in place. <br /> 4. Ion Exchangers <br /> Revised drawings have been received from IDI and <br /> review is complete. Minor changes must be made <br /> and some additional material needs to be ordered. <br /> MARLEY <br /> 4 <br /> A MARLEY COMPANY <br />