My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• , • • <br /> ( <br /> MAR 2 t( <br /> THE MARLEY COOLING TOWER COMPANY ENVIRnenEAn,,, <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 PERMIT/SERVICES, <br /> March 17, 1987 <br /> Mr. Jim Austrena <br /> Dept. of Health Services <br /> Toxic Substances Control Div, <br /> 4410 Power Inn Road <br /> Sacramento, CA 95826 <br /> RE: Progress Report - Stockton Assessment Program. <br /> Dear Mr. Austreng: <br /> This report is to summarize the activities at the Stockton <br /> facility from February 4, 1987 until March 13, 1987, <br /> I . Pond Closure <br /> A. Construction <br /> 1 . Perimeter Curb <br /> The perimeter curb is complete except for the <br /> asphalt portion at the railroad loading dock. <br /> This will be done when warmer weather is here. <br /> 2. Sludge Basin and Flow Equalization Basin <br /> The rain delayed installation of the liner until <br /> the week of March 2. The liner is in place and <br /> back fill of sand has started ( pictures were shown <br /> at our meeting on March 12) . <br /> 3. Force Main <br /> The 12 inch force main is complete to the building <br /> and will be tied into system when ion exchanges <br /> are in place. <br /> 4. Ion Exchangers <br /> Revised drawings have been received from IDI and <br /> review is complete. Minor changes must be made <br /> and some additional material needs to be ordered. <br /> MARLEY <br /> 4 <br /> A MARLEY COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.