5. Construction Schedule <br /> It was necessary to delay the ordering of some <br /> " long lead time" items until final details of the <br /> ion exchange process were resolved. As a result <br /> of this the completion of the water treatment <br /> plant will be delayed until July 1 , 1987. <br /> II. Phase II - Ground Water Assessment <br /> A. First Quarter Monitor Wells <br /> Results of the first quarter monitoring tests are not <br /> yet available. The analyses should be available by <br /> 3/ 23/ 87 and will be sent to ,you as soon as they are <br /> available. <br /> B. Extraction Well. <br /> A drawing showing proposed location of the extraction <br /> test well should also be available 3/ 23/87. The test <br /> well will not be constructed until location is <br /> approved by ,your office, the NPDES permit is approved <br /> and the treating plant is operational. <br /> C. Phase III Report <br /> The phase III report should be finished by mid <br /> April. <br /> III. Work Plan <br /> Revised work plan was submitted, by letter to J. Jones <br /> on January 9, 1987. <br /> IV. Revised NPDES Permit. <br /> The NPDES permit was revised to allow the discharge of <br /> around water and submitted to the Water Quality Control <br /> Board on February 27, 1987. <br /> V. Surface Water Sample - South Yard <br /> In the last report we had hoped to have the south .yard <br /> cleaned up and ready for another sample by the first of <br /> March. This was a much to ambitious estimate. It would <br /> now appear that the end of April is a more realistic <br /> date. However, we are trying to find a way to improve <br /> this date enough to get one more run off sample this <br /> spring. <br />