My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Construction Schedule <br /> It was necessary to delay the ordering of some <br /> " long lead time" items until final details of the <br /> ion exchange process were resolved. As a result <br /> of this the completion of the water treatment <br /> plant will be delayed until July 1 , 1987. <br /> II. Phase II - Ground Water Assessment <br /> A. First Quarter Monitor Wells <br /> Results of the first quarter monitoring tests are not <br /> yet available. The analyses should be available by <br /> 3/ 23/ 87 and will be sent to ,you as soon as they are <br /> available. <br /> B. Extraction Well. <br /> A drawing showing proposed location of the extraction <br /> test well should also be available 3/ 23/87. The test <br /> well will not be constructed until location is <br /> approved by ,your office, the NPDES permit is approved <br /> and the treating plant is operational. <br /> C. Phase III Report <br /> The phase III report should be finished by mid <br /> April. <br /> III. Work Plan <br /> Revised work plan was submitted, by letter to J. Jones <br /> on January 9, 1987. <br /> IV. Revised NPDES Permit. <br /> The NPDES permit was revised to allow the discharge of <br /> around water and submitted to the Water Quality Control <br /> Board on February 27, 1987. <br /> V. Surface Water Sample - South Yard <br /> In the last report we had hoped to have the south .yard <br /> cleaned up and ready for another sample by the first of <br /> March. This was a much to ambitious estimate. It would <br /> now appear that the end of April is a more realistic <br /> date. However, we are trying to find a way to improve <br /> this date enough to get one more run off sample this <br /> spring. <br />
The URL can be used to link to this page
Your browser does not support the video tag.