Laserfiche WebLink
0 • <br /> VI . South Yard Soil Assessment <br /> A work plan for the soil samples from the south yard <br /> ditches has been received from J. H. Kleinfelder and is <br /> being reviewed. If this plan agrees with the general <br /> work plan we will proceed as soon as possible with <br /> completion in mid-June. <br /> VII . Personnel Changes <br /> Mr. Kim Scott is now the Marley site representative. <br /> VIII . Schedule <br /> Revised schedule, date March 13, 1987 is attached. <br /> Sincerely, <br /> THE MARLEY COOLING TOWER COMPANY <br /> � '9 L .Q <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB: mhr <br /> cc: Mr. Robert Fujii -CRWQCB <br /> Mr. Marvin Young-EPA <br /> Ms. Jeanine Jones-DOHS <br /> Ms. Laurie Cotulla-S. J. L. H. D. <br /> Mr. Larry Schaper-Black & Veatch <br /> Mr. Thomas Hickey-Black & Veatch <br /> Mr. Peter Quinlan-Hargis & Assoc. <br /> Mr. Richard Landon-MCTC <br /> Mr. Wayne Struchtemeyer-MCTC <br /> Mr. Tim Verhagen-TMC <br /> Mr, Hal Daley-MCTC, Stockton <br />