My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxroge Drive/Mission, Kansas 66202/Telephone. (913)362-1818 -- - <br /> ENVIRO?MEwTAL HEALTH <br /> FERMIT/SERVICES <br /> February 4, 1987 <br /> Mr. Jim Austreng <br /> Dept. of Health Services <br /> Toxic Substances Control Div. <br /> 4410 Power Inn Road <br /> Sacramento, CA 95826 <br /> RE: Progress Report - Stockton Assessment Program. <br /> Dear Mr. Austreng: <br /> This report is to summarize the activities at the Stockton <br /> facility from January 5, 1986 to the present. <br /> I . Pond Closure <br /> A. Construction <br /> 1 . Perimeter Curb: In the last report I stated that <br /> the perimeter curb was complete. This is not <br /> quite true, due to a misunderstanding the <br /> following is the status of the curb: <br /> a. Concrete is poured and is complete. <br /> ( This is what should have been reported <br /> last month) . <br /> b. Joints between s-ction of curb have not <br /> been sealed and are waiting for material <br /> and warmer weather. <br /> c. Asphalt at south end of the yard has not <br /> been laid to close off the area around the <br /> railroad dock. This will be done when warmer <br /> and dryer weather will allow. <br /> 2. Sludge Basin and Flow Equalization Basin: <br /> Excavation is almost complete. The liner for <br /> secondary containment is scheduled to be <br /> installed week of Feb. 9 or Feb. 16, depending <br /> on the weather. <br /> A MARLEY COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.