My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 <br /> August 10, 1988 <br /> Mr. m Au reng <br /> k.[r4 <br /> DepaJirtmen o Heal S vices ', j <br /> Toxic Su stan es ontrol ivision <br /> 425.0 Po er Inn ad ENVIROMENTAL HEALTH <br /> Sact am to, California 95826 � ERt,( "/EER\rtCES <br /> RE: Progress Report June 1 , 1988 to July 31 , 1988 <br /> Dear Mr. Austreng: <br /> The following is a report of the activities at the <br /> Stockton site during June and July of 1988. <br /> A. Storm Water Retention Pond. <br /> 1 . All the sampling has been completed and the <br /> data has been transmitted with the " Engineering <br /> and Environmental Analysis of the Stormwater <br /> Retention Pond Closure Alternatives. " ( Draft <br /> Copy) submitted to the agencies on July 26, <br /> 1988. <br /> 2. Some of the data has been found to be in error. <br /> This is being discussed in other correspondence <br /> -T. A. Hickey' s letter of August 2, 1988 to Jim <br /> Austreng and Mary Beck' s ( Clayton Environmental <br /> Consultants) letter of August 5, 1988 to T. A. <br /> Hickey. <br /> 3. Meeting to discuss pond closure alternatives is <br /> scheduled for August 24, 1988 in the Department <br /> of Health Services Office at 10: 00 a. m. <br /> B. Quarterly Groundwater Samples <br /> 1 . Groundwater samples were taken the week of July <br /> 11 , 1988. Results of the analysis are not <br /> complete. The report is expected the week of <br /> August 22, 1988. <br /> MARLEY <br /> the 4 <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.