2. Comprehensive Groundwater Monitoring Evaluation <br /> was done on July 12, 1988. No report has been <br /> issued. <br /> 3. Next groundwater sampling is scheduled for <br /> October, 1988. <br /> C. Quarterly Lysimeter Samples <br /> 1 . The results of the analysis of the lysimeter <br /> samples taken on May 26, 1988 are attached. <br /> 2. The results of the analysis of the lysimeter <br /> samples taken on July 12, 1988 are included. <br /> 3. Next lysimeter sampling is scheduled for <br /> October, 1988, <br /> 4. Summary Sheets for the May 26 and July 12 data <br /> are attached. <br /> D. South Yard Storm Water Run Off Evaluation <br /> Comments on the report submitted on May 31 have <br /> been received from Water Board-Reents' letter of <br /> July 6, 1988. Action to be taken during the next <br /> rainy season will be discussed with Reents and Jim <br /> Austreng ( DHS) as an extension of the August 19th <br /> meeting. Report will then be revised to show <br /> additional testing plan and to meet other concerns <br /> of the July 6th letter. <br /> E. Phase IV Groundwater Assessment <br /> Meeting is scheduled for August 19, 1988 with DHS, <br /> RWQCB, Hargis and Marley to resolve remaining <br /> questions on the Phase IV Groundwater assessment. <br /> Work is scheduled to start second week of <br /> September, 1988. <br /> F. Off-Site Soil Samples <br /> The off-site soil samples around the North and <br /> South Yards have been taken. The analysis and <br /> report have not been completed. Report from <br /> Groundwater Management Inc. is expected around <br /> first of September. <br /> G. Work Plan Schedule <br /> Revise work plan schedule for the site is attached. <br />