My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Comprehensive Groundwater Monitoring Evaluation <br /> was done on July 12, 1988. No report has been <br /> issued. <br /> 3. Next groundwater sampling is scheduled for <br /> October, 1988. <br /> C. Quarterly Lysimeter Samples <br /> 1 . The results of the analysis of the lysimeter <br /> samples taken on May 26, 1988 are attached. <br /> 2. The results of the analysis of the lysimeter <br /> samples taken on July 12, 1988 are included. <br /> 3. Next lysimeter sampling is scheduled for <br /> October, 1988, <br /> 4. Summary Sheets for the May 26 and July 12 data <br /> are attached. <br /> D. South Yard Storm Water Run Off Evaluation <br /> Comments on the report submitted on May 31 have <br /> been received from Water Board-Reents' letter of <br /> July 6, 1988. Action to be taken during the next <br /> rainy season will be discussed with Reents and Jim <br /> Austreng ( DHS) as an extension of the August 19th <br /> meeting. Report will then be revised to show <br /> additional testing plan and to meet other concerns <br /> of the July 6th letter. <br /> E. Phase IV Groundwater Assessment <br /> Meeting is scheduled for August 19, 1988 with DHS, <br /> RWQCB, Hargis and Marley to resolve remaining <br /> questions on the Phase IV Groundwater assessment. <br /> Work is scheduled to start second week of <br /> September, 1988. <br /> F. Off-Site Soil Samples <br /> The off-site soil samples around the North and <br /> South Yards have been taken. The analysis and <br /> report have not been completed. Report from <br /> Groundwater Management Inc. is expected around <br /> first of September. <br /> G. Work Plan Schedule <br /> Revise work plan schedule for the site is attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.