My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362.1818 <br /> December 7, 1988 <br /> v�E SE�J\G�5 <br /> Mr. Jim Austreng 10PE��\�1 <br /> Departmento ea Services <br /> Toxic Subs ances Control Division <br /> 4250Pow r Inn Road <br /> Sacra to, California 95826 <br /> RE: Progress Report October and November, 1988 <br /> Dear Mr. Austreng: <br /> The following is a report of the activities related to <br /> the Stockton site during October and November of 1988. <br /> A. Storm Hater Retention Pond. <br /> 1 . The " Pond" has been winterized as agreed to <br /> by Mr. White and Mr. Kroehle. <br /> 2. The Engineering and Environmental Analysis was <br /> submitted on November 7, 1988 with proposal <br /> for closing the Pond. This proposal was ver- <br /> bally rejected by the Department of Health , <br /> Services at a meeting on November 15, 1988. A <br /> sketch showing an alternate closure that is <br /> acceptable to the Department of Health <br /> Services was submitted November 29, 1988 at <br /> the request of the Department of Health <br /> Services. <br /> 3. The Pond Closure Work Plan is on hold pending <br /> final agreement on the closure details. It is <br /> estimated that 4-6 weeks will be required to <br /> complete work plan after agreement is reached. <br /> B. Quarterly Ground Hater Samples. <br /> 1 . The quarterly monitoring report was released <br /> under separate cover, from Hargis + Associates <br /> on November 16, 1988. This was for samples <br /> taken September 26, 1988. <br /> 2. The next quarterly monitoring round will be in <br /> late December or early January. <br /> MARLE,Y <br /> the 6 <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.