My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Quarterly Lysimeter Samples. <br /> 1 . The quarterly lysimeter report is attached. <br /> This is for samples taken September 26, 1988. <br /> 2. The next lysimeter samples will be taken with <br /> the quarterly groundwater sample. <br /> D. Phase IV Groundwater Assessment. <br /> 1 . There are now 15 Phase IV wells in place. The <br /> data collected from these wells is presently <br /> being reviewed. <br /> 2. An Interim or Summary Report will be issued as <br /> soon as data is available. <br /> 3. Meeting is scheduled for December 12th to dis- <br /> cuss Phase IV progress. Hargis, Department of <br /> Health Services and Marley personnel to par- <br /> ticipate. The meeting will be at the Hargis <br /> Office in LaJolla, California. <br /> E. Storm Water Pretreatment Plant. <br /> 1 . The Pretreatment Plant is scheduled to be <br /> completed the week of December 12. <br /> 2. Operator training is scheduled for December <br /> 19-21 . The plant will then be operational. <br /> Please advise if you have any questions. <br /> Sincerely, <br /> THE MARLEY COOLING TOWER CO. <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB/jel <br /> cc' s: Charles White-DOHS Val Siebal-DOHS <br /> Ronald Valinoti -SJEHD Gary Reents-CRWQCB <br /> Jeff Zelikson-USEPA Tim Verhagen-TMC <br /> Terry Hart-MCTC Tom Hickey-Black & Veatch <br /> Hal Daley-Stockton File <br /> Karl Lytz-Latham & Watkins <br />
The URL can be used to link to this page
Your browser does not support the video tag.