My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In any case, we should be able to recognize a problem situation <br /> enough in advance that the proper measures can be taken to allow <br /> the program to continue on schedule. <br /> Scheduling for the analyses of the samples presents more of a <br /> financial burden than a problem which could affect the project <br /> schedule. The standard laboratory turn-around time for the <br /> analyses we are requesting is between 2-3 weeks. Sample results <br /> can be accelerated through the use of priority time basis in the <br /> laboratory. The costs associated with priority time analyses <br /> exceed the standard laboratory rates by approximately fifty <br /> percent. We have calculated the analytical costs according to <br /> both standard rate schedules and priority rate schedules for the <br /> purpose Of comparison. Both estimates are found in Section 5, <br /> COST ESTIMATE. <br /> GMI <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.