My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY �''• ��, <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 <br /> April 11, 1988 <br /> Mr. Jim Aust <br /> Dep rtment f Heal Services <br /> Toxi Sub ances Con 1 1 vision <br /> 4250 Var Inn Road <br /> Sacramento, California 95826 <br /> RE: Progress Report <br /> Dear Mr. Austreng: <br /> As we discussed on the phone the work plan submitted to <br /> you on March 15 , 1988 should be considered a comprehensive <br /> progress report. The following brief summary is what has <br /> happened since March 15 , 1988 . <br /> A. Storm Water Retention Pond <br /> 1. Discharge to the pond ceased before the <br /> March 15 , 1988 deadline. <br /> 2 . The bulk of the water was removed from the <br /> Pond and treated by March 15th. The pump <br /> was repositioned to the low point and the <br /> remaining water was removed and treated on <br /> March 22 , 1988 . <br /> 3 . The week of 3/29/88 the shallow soil sample <br /> required in Exhibit D paragraph 4 ( b) of the <br /> RAO were taken as well as the samples of the <br /> sludge required by paragraph 3 . <br /> B. Quarterly Groundwater Samples <br /> Attached are the results of the analysis of the <br /> groundwater samples taken during January, 1988 <br /> for the quarterly review. <br /> MARLED <br /> the , <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.