My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 Cont . <br /> C. Future Activities <br /> 1. Stormwater Retention Pond. <br /> The current schedule for the deep borings <br /> is the week of April 18 , 1988 . <br /> D. Work Plan Revision <br /> Based on the completion of these activities , the <br /> current Work Plan has been revised to reflect pro- <br /> gress. The following revised or new pages are sub- <br /> mitted for insertion into the work plan binders. <br /> Revised pages are noted by a revision data of 4-8-88 <br /> in the lower right hand corner. Revised passages <br /> are further identified by a vertical bar in the right <br /> hand margin of each page. <br /> 1. Insert attached spine in the acetate pocket <br /> provided on the binder. <br /> 2 . Substitute the following pages for like <br /> numbered pages : <br /> iii <br /> iv <br /> v <br /> 2-24 Table 2-12 <br /> 2-25 Table 2-12 Continued <br /> 2-26 Table 2-12 Continued <br /> 3 . Remove Section 7 . 0 "Other Activities" in <br /> its entirety and replace with new pages 7-1 <br /> thru 7-5 and new Figure 7-1 "Other Activities <br /> Schedule. " <br /> 4 . Insert Figure A-1 at end of Attachment A. <br /> 5 . Insert Attachment B in place of existing note. <br /> Please advise if you have any questions . <br /> Sincerely, <br /> MAR//L��EYII `COOLING TOWER CO. <br /> rtFM.c4J l l.) . <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB/jel <br /> Attachment <br /> cc ' s : Charles white-DOHS Van Siebal-DOHS <br /> Ronald Valinoti-SJEHD Gary Reents-CRWQCB <br /> Jeff Zelikson-USEPA Tim Verhagen-TMC <br /> Terry Hart-MCTC Tom Hickey-Black & Veatch <br /> Hal Daley-Stockton F le <br />
The URL can be used to link to this page
Your browser does not support the video tag.