Laserfiche WebLink
Page 2 Cont . <br /> C. Future Activities <br /> 1. Stormwater Retention Pond. <br /> The current schedule for the deep borings <br /> is the week of April 18 , 1988 . <br /> D. Work Plan Revision <br /> Based on the completion of these activities , the <br /> current Work Plan has been revised to reflect pro- <br /> gress. The following revised or new pages are sub- <br /> mitted for insertion into the work plan binders. <br /> Revised pages are noted by a revision data of 4-8-88 <br /> in the lower right hand corner. Revised passages <br /> are further identified by a vertical bar in the right <br /> hand margin of each page. <br /> 1. Insert attached spine in the acetate pocket <br /> provided on the binder. <br /> 2 . Substitute the following pages for like <br /> numbered pages : <br /> iii <br /> iv <br /> v <br /> 2-24 Table 2-12 <br /> 2-25 Table 2-12 Continued <br /> 2-26 Table 2-12 Continued <br /> 3 . Remove Section 7 . 0 "Other Activities" in <br /> its entirety and replace with new pages 7-1 <br /> thru 7-5 and new Figure 7-1 "Other Activities <br /> Schedule. " <br /> 4 . Insert Figure A-1 at end of Attachment A. <br /> 5 . Insert Attachment B in place of existing note. <br /> Please advise if you have any questions . <br /> Sincerely, <br /> MAR//L��EYII `COOLING TOWER CO. <br /> rtFM.c4J l l.) . <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB/jel <br /> Attachment <br /> cc ' s : Charles white-DOHS Van Siebal-DOHS <br /> Ronald Valinoti-SJEHD Gary Reents-CRWQCB <br /> Jeff Zelikson-USEPA Tim Verhagen-TMC <br /> Terry Hart-MCTC Tom Hickey-Black & Veatch <br /> Hal Daley-Stockton F le <br />