My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.3 Precision. Accuracy. and Representativeness <br /> Precision and accuracy will be assessed for analyses as discussed in <br /> Section 4.3.2.2 of the Current Work Plan. <br /> 6.4 Corrective Action <br /> If quality control audits or data review result in detection of <br /> unacceptable data, the appropriate corrective action will be taken. <br /> Corrective action measures are presented in Section 4.3.2.1 of the <br /> Current Work Plan. <br /> 7.0 SAFETY <br /> Sampling personnel may be exposed to low concentrations of wood <br /> treating chemicals during the simulated storm water sampling. To minimize <br /> exposure and to maximize validity of sampling results, all storm water <br /> sampling activities will be conducted in accordance with the Health and <br /> Safety Plan developed for site remedial action work activities. <br /> 8.0 GENERAL REQUIREMENTS <br /> 8.1 Sampling Areas <br /> Untreated wood and equipment is currently palletized and stored in the <br /> proposed sampling areas. The sampling contractor shall make arrangements <br /> with Mr. Tom Peterson, Plant Engineer, for moving the untreated wood and <br /> equipment, if deemed necessary. <br /> 8.2 Laboratory Qualifications <br /> Qualified laboratories certified by DOHS' Hazardous Materials <br /> Laboratory Program will be analyzing the samples. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.