My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� r <br /> THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Box 29127Mission, Kansas 66201/Telephone: (913) 362-1818 <br /> October 13, 1988D��� <br /> Mr. Jim Austr Q <br /> Dep tment f Health CT �$ V <br /> Toxic stances Control Division h/�, ?�l� ^ <br /> 4250 Power Inn Roadlry^ F.^., <br /> Sacramento, California 95826 �S O <br /> RE: Progress Report August and September of 198 . <br /> Dear Mr. Austreng: <br /> The following is a report of the activities at the <br /> Stockton site during August and September of 1988. <br /> A. Storm Water Retention Pond. <br /> 1 . Marley has submitted plan to winterize the <br /> stormwater retention pond ( T. Kroehle' s letter <br /> to C. White of September 6, 1988 attachment <br /> 164) . After a telephone conversation on <br /> September 28, 1988 between Mr. Kroehle and Mr. <br /> White and a follow-up conversation with Frank <br /> Dellechaie, Marley will proceed as proposed. <br /> Winterization should be complete by October <br /> 28. <br /> 2. The final Engineering and Environmental <br /> Analysis Report is being prepared to include <br /> the data that was requested in either the <br /> August 24, 1988 meeting or in C. White' s letter <br /> of September 7, 1988, Enclosure One. It was <br /> originally estimated the Engineering and <br /> Environmental Analysis Report would be <br /> available by October 17, 1988. The Group 2 <br /> Arsenic Reanalysis has not been received and <br /> this will delay the report until October 31 , <br /> 1988. The Group 1 Arsenic Reanalysis was <br /> submitted to Mr. Charles White in Mr. Hickey' s <br /> letter of September 23, 1988. It' s now <br /> anticipated that the revised Pond Closure Plan <br /> will be available November 15, 1988. <br /> MARLED <br /> the 4. <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.